| 4267 |
SWIM Test and Evaluation Services |
Undecided |
William J. Hughes Technical Center |
Steve Malitsky ,System Communication & Information Team 609-485-5385 |
$1,000,000 |
$9,000,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4268 |
Website Development - Phase 3 |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Non-Competitive |
Mike Monroney Aeronautical Center |
Cheri Milburn ,AeroNav Products 405-954-8975 |
$1 |
$100,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4269 |
Enroute Chart Automation - Phase 3 |
Single-Source |
Mike Monroney Aeronautical Center |
Cheri Milburn ,AeroNav Products 405-954-8975 |
$1 |
$1,500,000 |
2nd Qtr 2012 |
4th Qtr 2012 |
| 4270 |
Airport Mapping Development |
Small Business (SB) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Cheri Milburn ,AeroNav Products 405-954-8975 |
$1 |
$500,000 |
2nd Qtr 2012 |
4th Qtr 2012 |
| 4271 |
Visual Charting Gap Analysis |
Single-Source |
Mike Monroney Aeronautical Center |
Cheri Milburn ,AeroNav Products 405-954-8975 |
$1 |
$50,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4272 |
IAP Charting GAP Analysis |
Single-Source |
Mike Monroney Aeronautical Center |
Cheri Milburn ,AeroNav Products 405-954-8975 |
$1 |
$50,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4273 |
Airport Financial Reporting Program (CATS) Website & financial data collection. |
Single-Source |
National Headquarters |
Randy Fiertz ,Airport Compliance & Management Analysis 202-267-8728 |
$100,000 |
$175,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4274 |
Airport compliance consultant |
Unrestricted |
National Headquarters |
Randy Fiertz ,Airport Compliance & Management Analysis 202-267-8728 |
$50,000 |
$70,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4275 |
Contact database |
Single-Source |
National Headquarters |
Kevin Willis ,Airport Compliance & Management Analysis 202-267-8741 |
$30,000 |
$450,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4276 |
Contract assistance for VALE program. |
Single-Source |
National Headquarters |
Ralph Thompson ,Airport Planning & Environmental 202-267-3263 |
$10,000 |
$75,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4277 |
Contract support for SOAR data entry and mailing requirements (March 2012-August 2012) |
Single-Source |
National Headquarters |
John Hill ,Airport Planning & Programming 202-267-8553 |
$50,000 |
$125,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4278 |
Upgrades to SOAR hardware and supporting software. |
Single-Source |
National Headquarters |
John Hill ,Airport Planning & Programming 202-267-8553 |
$10,000 |
$50,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4279 |
Extension or bridge contract support for SOAR (March 2012-August 2012) |
Single-Source |
National Headquarters |
John Hill ,Airport Planning & Programming 202-267-8553 |
$400,000 |
$800,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4280 |
Replacement and Maintenance of SOAR (August 2012-August 2022) |
Undecided |
National Headquarters |
John Hill ,Airport Planning & Programming 202-267-8553 |
$10,000,000 |
$20,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4281 |
Contract assitance for the AIP Report |
Single-Source |
National Headquarters |
Kay Ryder ,Airport Improvement Program 202-493-5585 |
$10,000 |
$40,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4282 |
Contract assistance for BCA review |
Single-Source |
National Headquarters |
Joe Hebert ,Financial Analysis & Passenger Facility 202-267-8375 |
$25,000 |
$50,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4283 |
Indefinite quantity task-order consulting services contract (October 2012-October 2016) |
Single-Source |
National Headquarters |
Elliott Black ,Airport Planning & Programming 202-267-8775 |
$2,000,000 |
$3,000,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4284 |
Copier Maintenance |
Single-Source |
National Headquarters |
Charlene T. Brown ,Office of Rulemaking 202-267-8487 |
$2,100 |
$2,100 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4285 |
Administrative services contract for secretarial services. Multi-year contract with the dollar amount cited as the first of five years. |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
William J. Hughes Technical Center |
Rick Gonzalez ,NextGen Business Operations Group 609-485-4967 |
$820,000 |
$1,980,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4286 |
NAS Laboratory Maintenance |
Small Business (SB) Competitive Set-Aside |
William J. Hughes Technical Center |
Sharon Campanella ,Laboratory Maintenance 609-485-6841 |
$12,000,000 |
$15,000,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4287 |
AFTIL Engineering, Modeling, & Simulation support |
Small Business (SB) Competitive Set-Aside |
William J. Hughes Technical Center |
Dan Leary ,Tower/TRACON Modeling & Simulation 609-485-8453 |
$1,000,000 |
$7,000,000 |
1st Qtr 2012 |
4th Qtr 2012 |
| 4288 |
Technical Center air shuttle program with flights from Atlantic City, NJ to DC and return twice daily. |
Undecided |
William J. Hughes Technical Center |
Michele Holmes ,Service Liasion Staff 609-485-5614 |
$1,000,000 |
$7,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4289 |
WJHTC Bldg 300 roof replacement |
Undecided |
William J. Hughes Technical Center |
Dennis Steelman ,Facilities 609-485-4375 |
$4,000,000 |
$8,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4290 |
Replace electrical sub-stations 2, 4, & 5 in Bldg 300 |
Undecided |
William J. Hughes Technical Center |
Dennis Steelman ,Facilities 609-485-4375 |
$5,000,000 |
$9,000,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4291 |
Final phase of Bldg 301 HVAC replacement |
Undecided |
William J. Hughes Technical Center |
Dennis Steelman ,Facilities 609-485-4375 |
$2,000,000 |
$2,500,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4292 |
EOSH Technical Services Support |
Undecided |
William J. Hughes Technical Center |
J. Repko ,Environmental and Safety Team 609-485-4917 |
$3,000,000 |
$7,000,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4293 |
Replace building at Tyler RTR/RCAG |
Small Business (SB) Competitive Set-Aside |
Central Service Area |
Jonathan Page ,Acquisitions 817-222-4352 |
$500,000 |
$1,000,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4294 |
Replace building at Monroe RTR/RCAG. |
Small Business (SB) Competitive Set-Aside |
Central Service Area |
Jonathan Page ,Acquisitions 817-222-4352 |
$500,000 |
$1,000,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4295 |
Replace coazial cables at Woodworth, ND RCAG |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Central Service Area |
Jonathan Page ,Acquisitions 817-222-4352 |
$25,000 |
$100,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4296 |
Replace coaxial cables at Marion, IL RCAG |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Central Service Area |
Jonathan Page ,Acquisitions 817-222-4352 |
$25,000 |
$100,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4297 |
New building at Green Bay, WI RTR |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Central Service Area |
Jonathan Page ,Acquisitions 817-222-4352 |
$500,000 |
$1,000,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4298 |
Refurbish ATCT at Baton Rouge, LA |
Small Business (SB) Competitive Set-Aside |
Central Service Area |
Jonathan Page ,Acquisitions 817-222-4352 |
$1,000,000 |
$5,000,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4299 |
Console work at Chicago, IL ATCT |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Central Service Area |
Jonathan Page ,Acquisitions 817-222-4352 |
$1,000,000 |
$5,000,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4300 |
Compensation Consulting Services |
Undecided |
National Headquarters |
John Shamley ,Human Resources, Policy Management 202-385-8010 |
$50,000 |
$1,000,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4301 |
Federal Retirement Benefits - retirement calculator |
Single-Source |
National Headquarters |
Teresa Marler ,Human Resources, Benefits and Worklife 202-267-9468 |
$100,000 |
$150,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4302 |
Multi-year Verification & Validation (V&V) service contract. Dollar amount is for the first year only. Award quarter dependent on acquisition strategy and may extend into FY13. |
Undecided |
William J. Hughes Technical Center |
Rick Gonzalez ,Nextgen Business Operations 609-485-4967 |
$10,000,000 |
$25,000,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4303 |
Provide consulting services to support the Joint Planning and Development Office (JPDO0 Weather Integrated Product Team. |
Small Business (SB) Competitive Set-Aside |
National Headquarters |
Linwood Gillette ,Aviation Weather Group 202-493-4753 |
$30,000 |
$100,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4304 |
Assess what weather information is currently being integrated into cockpit navigation systems (e.g., flight management systems (FMS) and what decisions it supports. |
Small Business (SB) Competitive Set-Aside |
National Headquarters |
Linwood Gillette ,Aviation Weather Group 202-493-4753 |
$100,000 |
$250,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4305 |
Develop an automated network simulation with transmitter, reciever and link models to assess the bandwidth availability, geographic coverage, latency, reliability and dissemination using ADSB, VHF Digital Link Mode 2, Iridum Global Netork, and Inmarsat Sw |
Small Business (SB) Competitive Set-Aside |
National Headquarters |
Linwood Gillette ,Aviation Weather Group 202-493-4753 |
$50,000 |
$150,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4306 |
For the quantitative analysis and prediction of the impact of weather on NAS operations as measured by avoidable and unavoidable losses. Losses include delays, cancellations, diversions, excess fuel burn, and accidents/incidents induced by weather. |
Small Business (SB) Competitive Set-Aside |
National Headquarters |
Janella E. Davis ,Aviation Weather Group 202-267-5109 |
$95,000 |
$180,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4308 |
Aviation Weather Business Support |
Small Business (SB) Competitive Set-Aside |
National Headquarters |
Connie Brown ,Aviation Weather Group 202-267-3634 |
$12,000 |
$100,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4309 |
Labor and Supervision |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Lisa Suiter ,Mike Monroney Aeronautical Center 405-954-3976 |
$2,420,833 |
$2,420,833 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4310 |
Review/Interpret ECO's |
Small Business (SB) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Lisa Suiter ,Mike Monroney Aeronautical Center 405-954-3976 |
$124,800 |
$124,800 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4311 |
EAP/Worklife Solutions, Geriatric Care Management, Benefits and Worklife Services for employees |
Undecided |
National Headquarters |
Rosemary Katchmar ,Human Resources, Benefits and Worklife 202-493-4320 |
$55,000 |
$1,700,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4312 |
Child Care Subsidy program |
Single-Source |
National Headquarters |
Teresa Marler ,Human Resources, Benefits and Worklife 202-267-9468 |
$1,000,000 |
$1,500,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4313 |
In order to accomplish our mission, we require contractual support for both Information Technology (IT) and oversight/operational financial activities. DELPHI is the commercial-off–the-shelf (COTS) Oracle Federal Financials software, hosted at the DOT facility in Oklahoma City, with approximately 1,200 users. PRISM is the FAA’s procurement software owned and operated by the FAA, with approximately 5,000 users, and integrated with DELPHI. This is a re-compete of a current contract. |
Partial Small Business (SB) Set-Aside |
National Headquarters |
Willaton Burns ,Office of Financial Services, ABA 202-267-9537 |
$24,000,000 |
$25,000,000 |
2nd Qtr 2012 |
4th Qtr 2012 |
| 4314 |
Replace Runway 34 RVR & establish Runway TD |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Matthew Fitzgerald ,NAVAIDS Engineering Center B 718-553-3464 |
$25,000 |
$100,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4315 |
Replace Straight-In VASI for Runway 31 at LaGuardia Airport |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Al Arcese ,NAVAIDS Engineering Center C 781-238-7926 |
$100,000 |
$250,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4316 |
Install a CAST DME for Runway 27, Williamsport, PA |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Yiu Ming Chan ,NAVAIDS Engineering Center B 718-553-3038 |
$25,000 |
$100,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4317 |
Relocate FFM Runway 01, Ronald Reagan Washington National Airport. |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Simon Sohn ,NAVAIDS Engineering Center B 718-553-4924 |
$25,000 |
$50,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4318 |
Maintenance and Development Support for the National Airspace System (NAS) Adaptation Services Environment (NASE) Web Portal. |
Undecided |
National Headquarters |
Harry Lutz ,Contracting for Services Group 609-485-6127 |
$500,000 |
$9,000,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4319 |
Install Glideslope on Ruwway 19, Rutland, VT. |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Al Arcese ,NAVAIDS Engineering Center C 781-238-7926 |
$100,000 |
$250,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4320 |
Establish CAST DME, Runway 18, Myrtle Beach International Airport, SC. |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Dennis Criswell ,NAVAIDS Engineering Center A 404-389-8545 |
$1 |
$25,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4321 |
Relocate LOC Runway 8, San Juan, PR |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Teronda Jackson ,NAVAIDS Engineering Center A 404-389-8537 |
$1 |
$25,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4322 |
Runway 27 LOC, Runway 09 Relocate Antenna Array |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Jay Waldron ,NAVAIDS Engineering Center A 404-389-8536 |
$1 |
$25,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4323 |
Relocation of the VOR-DME at Ft. Lauderdale, FL |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Jay Waldron ,NAVAIDS Engineering Center A 404-389-8536 |
$500,000 |
$1,000,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4324 |
Establish WAAS PD with the William J. Hughes Technical Center |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Frank Mierzejewski ,Logistics Management Team 609-485-6766 |
$500,000 |
$1,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4325 |
En Route Integration and Test Support for ERAM, Atlantic City, NJ |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Frank Mierzejewski ,Logistics Management Plan 609-485-4384 |
$100,000 |
$250,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4326 |
Establish GBAS PD with the Tech Center, NJ |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Frank Mierzejewski ,Logistics Management Team 609-485-4384 |
$5,000,000 |
$10,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4327 |
VSCS Technical Support Program Directive |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Frank Mierzejewski ,Logistics Management Team 609-485-4384 |
$25,000 |
$500,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4328 |
Refurbish ready room and kitchen area, Memphis ARTCC. |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Louri Call ,EnRoute/Flight Service Station Construct 901-368-8278 |
$25,000 |
$50,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4329 |
Fire Life Safety Upgrade, Erie, PA |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Brian Fonseca ,Infrastructure Engineering Center C 781-238-7480 |
$50,000 |
$100,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4330 |
Interior architectural refurbishment, Norfolk, VA. |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Daniel Doby ,Terminal Engineering Center - Atlanta 404-389-8676 |
$250,000 |
$500,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4331 |
Repair ALS Access Road, Runway 22L, JFK International Airport |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Coffee Bowe ,Infrastructure Engineering Center A 404-389-8571 |
$50,000 |
$100,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4332 |
Elevator repairs, White Plains, NY. |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Wayne Bethoney ,Operations Infrastructure Eng A 781-238-7491 |
$250,000 |
$500,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4333 |
Relocate Runway 32 LOC, Ithaca Tompkins Regional Airport, Ithaca, NY |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Philip Tortorice ,NAVAIDS Construction/Installation Center 718-553-4925 |
$50,000 |
$100,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4334 |
Refurbish ASR Tower, Nantucket, MA |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
William Luquette ,Infrastructure Engineering Center C 603-881-1259 |
$1 |
$25,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4335 |
Jackson, MS VORTAC |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Jerry Casavant ,Terminal Engineering Center - Boston 603-881-1171 |
$25,000 |
$50,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4336 |
Relocation Study for ASDE-X, Ft. Lauderdale, FL |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Jerry Casavant ,Terminal Engineering Center - Boston 603-881-1171 |
$100,000 |
$250,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4337 |
Relocate Center Field Wind Equipment, Key West, FL |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Jerry Casavant ,Terminal Engineering Center - Boston 603-881-1171 |
$1 |
$25,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4338 |
Install restroom facilities and additional storage space, Vero Beach, FL. |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Jerry Casavant ,Terminal Engineering Center - Boston 603-881-1171 |
$25,000 |
$50,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4339 |
Replace metal doors and door jambs, Bedford, MA |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Jerry Casavant ,Terminal Engineering Center - Boston 603-881-1171 |
$1 |
$25,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4340 |
Establish RVR Runway 5, Kinston, NC |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Teronda Jackson ,NAVAIDS Engineering Center A 404-389-8537 |
$1 |
$25,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4341 |
Install door position switches and parking lot lighting, Nashville, TN. |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Charles Folsom ,Infrastructure Engineering Center A 404-389-8464 |
$1 |
$25,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4342 |
Install parking lot lighting, Columbus, MS |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Charles Folsom ,Infrastructure Engineering Center A 404-389-8564 |
$1 |
$25,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4343 |
Relocation/Installation of Runway 20 RTR, Nashville, TN |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Joe Connor , Communications Engineering Center A 404-389-8776 |
$50,000 |
$100,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4344 |
REIL Replacement for Runway 21 at Hilton Head Airport, SC |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Kim Anderson , NAVAIDS Engineering Center A 404-389-8533 |
$25,000 |
$50,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4345 |
Refurbish elevator, Miami, FL |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Daniel Doby ,Terminal Engineering Center - Atlanta 404-389-8676 |
$250,000 |
$500,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4346 |
Replace HVAC, Tri City, TN |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Bob Bodron ,Terminal Engineering Center - Atlanta 404-389-8672 |
$1 |
$25,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4347 |
Replace shelter, Covington, KY |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Herschel Workman , Infrastructure Engineering Center - Atl 404-389-8573 |
$25,000 |
$50,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4348 |
Replace Runway 27 LOC Shelter, Covington, KY. |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Herschel Workman , Infrastructure Engineering Center - Atl 404-389-8573 |
$25,000 |
$50,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4349 |
Runway 27 VASI with PAPI relocation, Covington, KY |
Small Business (SB) Competitive Set-Aside |
Eastern Service Area |
Jay Waldron ,NAVAIDS Engineering Center A 404-389-8536 |
$1 |
$25,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4350 |
Replace damaged raised flooring tiles, level floor, and secure/replace loose/damaged pedestals and stringers at ZDV-ARTCC, Longmont, CO
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Chris Yaden ,Engineering - Technical Operations 425-227-2360 |
$150,000 |
$200,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4351 |
Replace entire sewer system in Administration Wing at ZDV-ARTCC, Longmont, CO.
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Chris Yaden ,Engineering - Technical Operations 425-227-2360 |
$50,000 |
$75,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4352 |
Reseal/repair loading dock driveway, including replacing handicap ramps and repairing drainage issues at ZDV-ARTCC, Longmont, CO
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Chris Yaden ,Engineering - Technical Operations 425-227-2360 |
$75,000 |
$100,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4353 |
Replace the under-the-floor fire protection system, various areas at ZDV-ARTCC, Longmont, CO.
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Chris Yaden ,Engineering - Technical Operations 425-227-2360 |
$50,000 |
$75,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4354 |
Replace damaged raised flooring tiles, level floor, and secure/replace loose/damaged pedestals and stringers at ZDV-ARTCC, Longmont, CO
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Chris Yaden ,Engineering - Technical Operations 425-227-2360 |
$50,000 |
$75,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4355 |
Refurbish main facility restrooms at ZLC-ARTCC, Salt Lake City, UT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Jason Devera ,Engineering - Technical Operations 425-227-2747 |
$20,000 |
$30,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4356 |
Replace various Power Panels (18-20) at ZLC-ARTCC, Salt Lake City, UT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Jason Devera ,Engineering - Technical Operations 425-227-2747 |
$100,000 |
$200,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4357 |
Replace four (4) AHUs in Control Wing Basement at ZLC-ARTCC, Salt Lake City, UT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Jason Devera ,Engineering - Technical Operations 425-227-2747 |
$200,000 |
$250,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4358 |
Repair Pump House; add exhaust fan at ZLC-ARTCC, Salt Lake City, UT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Jason Devera ,Engineering - Technical Operations 425-227-2747 |
$25,000 |
$50,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4359 |
Replace Victaulic Fittings in HOST Room at ZSE-ARTCC, Auburn, WA
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Marc Nagel ,Engineering - Technical Operations 425-227-1554 |
$25,000 |
$75,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4360 |
Repair Chilled water system and leak detection system at ZSE-ARTCC, Auburn, WA
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Marc Nagel ,Engineering - Technical Operations 425-227-1554 |
$100,000 |
$150,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4361 |
Provide/Install new AHU pit covers at ZSE-ARTCC, Auburn, WA
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Marc Nagel ,Engineering - Technical Operations 425-227-1554 |
$10,000 |
$20,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4362 |
Replace obsolete control panels on Chillers 100, 200, 400, 500 at ZSE-ARTCC, Auburn, WA
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Marc Nagel ,Engineering - Technical Operations 425-227-1554 |
$150,000 |
$200,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4363 |
Power Service Building Roof Replacement at ZSE-ARTCC, Auburn, WA
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Marc Nagel ,Engineering - Technical Operations 425-227-1554 |
$200,000 |
$250,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4364 |
Ensure integrity of Power Service Building envelope for water tightness (seal leaks in Engine Generator room) at ZSE-ARTCC, Auburn, WA
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Marc Nagel ,Engineering - Technical Operations 425-227-1554 |
$20,000 |
$30,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4365 |
Install Door open Holders in Operation Support Wing at ZSE-ARTCC, Auburn, WA
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Marc Nagel ,Engineering - Technical Operations 425-227-1554 |
$20,000 |
$30,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4366 |
Boiler Room Wall and Pipe Painting at ZSE-ARTCC, Auburn, WA
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Marc Nagel ,Engineering - Technical Operations 425-227-1554 |
$10,000 |
$20,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4367 |
Replace Operation Support Wing 2nd Floor Carpet at ZSE-ARTCC, Auburn, WA
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Marc Nagel ,Engineering - Technical Operations 425-227-1554 |
$50,000 |
$75,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4368 |
Denver Comm Vaults and Duct Banks
|
Undecided |
Western Service Area |
Ken Bailey ,Technical Operations 303-342-1440 |
$500,000 |
$1,000,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4369 |
Anchorage FOTS duct bank work
|
Undecided |
Western Service Area |
Trinh Do ,Engineering - Technical Operations 425-227-1685 |
$500,000 |
$750,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4370 |
Fresno Com cable replacement
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Alex Matamoros ,Technical Operations 661-265-8409 |
$10,000 |
$275,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4371 |
Boeing Field, Seattle, Com cable replacement
|
Undecided |
Western Service Area |
Son Le ,Technical Operations 253-804-2952 |
$300,000 |
$475,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4372 |
Colorado Springs, CO, Com cable replacement
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Son Le ,Technical Operations 253-804-2952 |
$15,000 |
$35,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4373 |
ZLA - Los Angeles ARTCC Replace Roof over Generator Bldg 900313
|
Unrestricted |
Western Service Area |
Art Gapasin ,Engineering - Technical Operations 310-725-7624 |
$200,000 |
$250,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4374 |
ZLA - Los Angeles ARTCC Replace Chilled Water Piping 808519
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Art Gapasin ,Engineering - Technical Operations 310-725-7624 |
$50,000 |
$100,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4375 |
ZLA - Los Angeles ARTCC Install Leak Detection 808520
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Art Gapasin ,Engineering - Technical Operations 310-725-7624 |
$25,000 |
$50,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4376 |
ZLA, Los Angeles ARTCC Replace MCCs 905189
|
Undecided |
Western Service Area |
Art Gapasin ,Engineering - Technical Operations 310-725-7624 |
$300,000 |
$400,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4377 |
ZLA, Los Angeles ARTCC Replace Isolation and Check Valves on Cooling Tower Pumps 905187
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Art Gapasin ,Engineering - Technical Operations 725-310-7624 |
$50,000 |
$75,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4378 |
ZLA, Los Angeles, ARTCC Repave/Restripe Parking Lot
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Art Gapasin ,Engineering - Technical Operations 310-725-7624 |
$50,000 |
$75,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4379 |
ZLA, Los Angeles ARTCC, Replace Sewer System in Admin Wing 901381
|
Undecided |
Western Service Area |
Art Gapasin ,Engineering - Technical Operations 310-725-7624 |
$250,000 |
$350,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4380 |
ZOA, Oakland ARTCC, Replace Roof over Generator Bldg 807971
|
Undecided |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$125,000 |
$175,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4381 |
ZOA, Oakland ARTCC, Replace Chilled Water Piping |
Undecided |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$120,000 |
$150,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4382 |
ZOA, Oakland ARTCC, Install Leak Detection 908223
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$20,000 |
$30,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4383 |
ZOA, Oakland ARTCC, Replace Make Up Water Line 908225
|
Undecided |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$125,000 |
$175,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4384 |
ZOA, Oakland ARTCC, Replace Armoured Flex Connectors 1000891
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$25,000 |
$50,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4385 |
ZOA, Oakland ARTCC, Replace Entire Sewer System 905873 (PH 1)
|
Undecided |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$150,000 |
$250,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4386 |
ZOA, Oakland ARTCC, Upgrade Electrical Vaults 908224
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$25,000 |
$50,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4387 |
ZOA, Oakland ARTCC, Install Various Isolation Valves |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$20,000 |
$40,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4388 |
ZOA, Oakland ARTCC, Replace Entire Sewer System (PH 2)
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$75,000 |
$125,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4389 |
ZOA, Oakland ARTCC, Basic Ordering Agreement (BOA) Contract - various mech projects
|
Undecided |
Western Service Area |
Scott Bradfisch ,Engineering - Technical Operations 310-725-7726 |
$150,000 |
$200,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4390 |
ZAN, Anchorage ARTCC, Replace one of three boilers |
Undecided |
Western Service Area |
Stan Lawrence ,Engineering - Technical Operations 907-269-1812 |
$200,000 |
$300,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4391 |
ZAN, Anchorage ARTCC, Construct Guardhouse Canopy |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
James Gentry ,Engineering - Technical Operations 907-271-3377 |
$75,000 |
$125,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4392 |
ZAN, Anchorage ARTCC, Replace Water Flow Sensors |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Stan Lawrence ,Engineering - Technical Operations 907-269-1812 |
$35,000 |
$60,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4393 |
ZAN, Anchorage ARTCC, Repair/Replace Roofing System |
Undecided |
Western Service Area |
James Gentry ,Engineering - Technical Operations 907-271-3377 |
$250,000 |
$350,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4394 |
ZAN, Anchorage ARTCC, Replace the Battery Room Unit Heaters |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Stan Lawrence ,Engineering - Technical Operations 907-269-1812 |
$15,000 |
$25,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4395 |
Maintenance Mechanical/Electrical Palm Springs, CA ATCT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Scott Earl ,Engineering - Technical Operations 310-725-6599 |
$25,000 |
$35,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4396 |
Janitorial, Palm Springs ATCT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Scott Earl ,Engineering - Technical Operations 310-725-6599 |
$15,000 |
$25,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4397 |
Elevator Maintenance Palm Springs ATCT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Scott Earl ,Engineering - Technical Operations 310-725-6599 |
$10,000 |
$15,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4398 |
Maintenance Mechanical/Electrical Kona, HI ATCT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Michael Isaacs ,Engineering - Technical Operations 310-725-7680 |
$15,000 |
$25,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4399 |
Janitorial Kona, HI ATCT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Michael Isaacs ,Engineering - Technical Operations 310-725-7680 |
$10,000 |
$15,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4400 |
Elevator Maintenance Kona,HI ATCT
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Michael Isaacs ,Engineering - Technical Operations 310-725-7680 |
$10,000 |
$15,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4401 |
Fuel, Alaska, - 5BB/PX - AL82EH0000
|
Undecided |
Western Service Area |
James Marcey ,Western Technical Operations 907-586-7500 |
$7,000 |
$11,400 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4402 |
Janitorial, Alaska, -BKA/QS -AL82HH0000
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
J Boyd ,Technical Operations 907-225-4900 |
$10,000 |
$15,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4403 |
Boiler replacement in Bettles, Alaska, quarters
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Dan Cryer ,Technical Operations 907-445-5775 |
$10,000 |
$20,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4404 |
Replace 2-70 ft.wooden poles or replace, Bettles, Alaska
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Dan Cryer ,Technical Operations 970-455-5775 |
$10,000 |
$20,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4405 |
Pueblo, CO RTR Building Fabrication
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Maximo Flores ,Engineering - Technical Operations 425-227-1136 |
$50,000 |
$100,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4406 |
Pueblo, CO RTR Construction
|
Undecided |
Western Service Area |
Michael Calhoon ,Engineering - Technical Operations 425-227-2976 |
$100,000 |
$250,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4407 |
Bellingham, WA - NEXCOM
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Maximo Flores ,Engineering - Technical Operations 425-227-1136 |
$50,000 |
$100,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4408 |
Spokane, WA - NEXCOM
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Michael Calhoon ,Engineering - Technical Operations 425-227-2976 |
$50,000 |
$100,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4409 |
Renton, WA - NEXCOM
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Maximo Flores ,Engineering - Technical Operations 425-227-1136 |
$50,000 |
$100,000 |
3rd Qtr 2012 |
2nd Qtr 2012 |
| 4410 |
Boeing Field, WA - NEXCOM
|
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Western Service Area |
Maximo Flores ,Engineering - Technical Operations 425-227-1136 |
$50,000 |
$100,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4411 |
Long Beach, CA LGB RTR Towers
|
Undecided |
Western Service Area |
Hani Khalil ,Engineering - Technical Operations 310-725-7780 |
$100,000 |
$250,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4412 |
DC-9 Pilot Training. |
Unrestricted |
Mike Monroney Aeronautical Center |
William Benhoff ,FAA Academy 405-954-6362 |
$250,000 |
$300,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4413 |
A-330 Pilot Training. |
Unrestricted |
Mike Monroney Aeronautical Center |
William Benhoff ,FAA Academy 405-954-6362 |
$250,000 |
$300,000 |
1st Qtr 2012 |
3rd Qtr 2012 |
| 4414 |
DC-10 Pilot Training. |
Unrestricted |
Mike Monroney Aeronautical Center |
William Benhoff ,FAA Academy 405-954-6362 |
$150,000 |
$200,000 |
1st Qtr 2012 |
3rd Qtr 2012 |
| 4415 |
DHC-8 Pilot Training. |
Unrestricted |
Mike Monroney Aeronautical Center |
William Benhoff ,FAA Academy 405-954-6362 |
$450,000 |
$500,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4416 |
SD3-60 Pilot Training. |
Unrestricted |
Mike Monroney Aeronautical Center |
William Benhoff ,FAA Academy 405-954-6362 |
$200,000 |
$250,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4417 |
DO-328-300 Pilot Training. |
Unrestricted |
Mike Monroney Aeronautical Center |
William Benhoff ,FAA Academy 405-954-6362 |
$250,000 |
$300,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4418 |
Consolidated Aircraft Maiantenance Systems Training. |
Unrestricted |
Mike Monroney Aeronautical Center |
Gary Ask ,FAA Academy 405-954-6719 |
$450,000 |
$500,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4419 |
Regulatory Standards (AMA-200) Instructional Support Services. |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Karie Skipper ,FAA Academy 405-954-3026 |
$15,000,000 |
$25,000,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4420 |
Technical Operations (AMA-400) Instructional Support Services. |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Marianne McDaniel ,FAA Academy 405-954-5834 |
$15,000,000 |
$17,000,000 |
2nd Qtr 2012 |
4th Qtr 2012 |
| 4421 |
Facilities Maintenance Services. |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Travis Hildebrand ,Office of Facility Management 405-954-4571 |
$45,000,000 |
$49,000,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4422 |
Janitorial Services (NISH/Ability One Program). |
Single-Source |
Mike Monroney Aeronautical Center |
Glen McClain ,Office of Facility Management 405-954-4571 |
$10,000,000 |
$13,000,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4423 |
Solid Waste Services. |
Unrestricted |
Mike Monroney Aeronautical Center |
Glen McClain ,Office of Facility Management 405-954-4571 |
$800,000 |
$1,000,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4424 |
Structural Engineering Services. |
Small Business (SB) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Dwaine Rhodes ,Office of Facility Management 405-954-4574 |
$1,000,000 |
$2,000,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4425 |
Construction Testing Services. |
Small Business (SB) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Dwaine Rhodes ,Office of Facility Services 405-954-4574 |
$1,000,000 |
$2,000,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4426 |
Civil Engineering Services. |
Small Business (SB) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Dwaine Rhodes ,Office of Facility Management 405-954-4574 |
$1,000,000 |
$2,000,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4427 |
Renovation of Bldg. 23 (Systems Training Bldg.) |
Unrestricted |
Mike Monroney Aeronautical Center |
Mike Mills ,Office of Facility Management 405-954-4574 |
$20,000,000 |
$25,000,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4428 |
Building 27 (Thomas P. Stafford Bldg.) Expansion. |
Unrestricted |
Mike Monroney Aeronautical Center |
Mike Mills ,Office of Facility Management 405-954-4574 |
$4,000,000 |
$6,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4429 |
Building 223, 224 and 225 Remodel. |
Unrestricted |
Mike Monroney Aeronautical Center |
Mike Mills ,Office of Facility Management 405-954-4574 |
$1,000,000 |
$2,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4430 |
Building 1 (Headquarter's) Entrace Addition and Parking Lot Construction. |
Unrestricted |
Mike Monroney Aeronautical Center |
Cynthia Hurc ,Office of Facility Management 405-954-4574 |
$2,000,000 |
$3,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4431 |
ACEPS Training and Engineering Facility Construction. |
Unrestricted |
Mike Monroney Aeronautical Center |
David Dorety ,Office of Facility Management 405-954-4574 |
$4,000,000 |
$5,000,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4432 |
Customization Support. |
Single-Source |
Mike Monroney Aeronautical Center |
Teresa Thomas ,Enterprise Services Center 405-954-0867 |
$4,000,000 |
$5,000,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4433 |
Value Added Network (VAN) |
Undecided |
Mike Monroney Aeronautical Center |
Teresa Thomas ,Enterprise Services Center 405-954-0867 |
$125,000 |
$150,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4434 |
Support Services. |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Mark Jones ,FAA Logistics Center 405-954-2380 |
$10,000,000 |
$15,000,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4435 |
Miscellaneous Electrical/Electronic/Mechannical/Industrial Parts. |
Unrestricted |
Mike Monroney Aeronautical Center |
Rebecca Mauldin ,FAA Logistics Center 405-954-7915 |
$10,000,000 |
$11,000,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4436 |
Purchase of ILS Shelters. |
Unrestricted |
Mike Monroney Aeronautical Center |
Cathy Tassell ,FAA Logistics Center 405-954-9684 |
$10,000,000 |
$15,000,000 |
1st Qtr 2012 |
3rd Qtr 2012 |
| 4437 |
On-Site ILS Shelter Installation Services. |
Unrestricted |
Mike Monroney Aeronautical Center |
Lisa Webster ,FAA Logistics Center 405-954-9618 |
$6,000,000 |
$8,000,000 |
1st Qtr 2012 |
3rd Qtr 2012 |
| 4438 |
Radome for Doppler VOR (NSN 5985-00198-4906). |
Unrestricted |
Mike Monroney Aeronautical Center |
Buddy Chandler ,FAA Logistics Center 405-954-5691 |
$900,000 |
$1,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4439 |
Par-56, 500 Watt Lamp for ALS (NSN 6240-01-217-0894). |
Unrestricted |
Mike Monroney Aeronautical Center |
Karen Lafferty ,FAA Logistics Center 405-954-5616 |
$500,000 |
$700,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4440 |
Light Gun for ATCT (NSN 6230-01-493-7433). |
Unrestricted |
Mike Monroney Aeronautical Center |
Lisa Webster ,FAA Logistics Center 405-954-9618 |
$500,000 |
$600,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4441 |
Lamp, FT34HP, for ALS (NSN 6240-01-006-1260). |
Unrestricted |
Mike Monroney Aeronautical Center |
Cathy Tassell ,FAA Logistics Center 405-954-9684 |
$600,000 |
$700,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4442 |
Battery for MARK 20 (NSN 6140-01-291-6488) |
Unrestricted |
Mike Monroney Aeronautical Center |
Sharon Snow ,FAA Logistics Center 405-954-9572 |
$1,000,000 |
$2,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4443 |
Shorting Device for PAPI (NSN 5920-01-562-8136) |
Unrestricted |
Mike Monroney Aeronautical Center |
Pam Grisby ,FAA Logistics Center 405-954-5608 |
$900,000 |
$1,000,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4444 |
Oil for ASR-9 Radar Systems (NSN 9150-01-389-2196, and NSN 9160-01-142-5748. |
Unrestricted |
Mike Monroney Aeronautical Center |
Charene Johnson ,FAA Logistics Center 405-954-5758 |
$500,000 |
$700,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4445 |
Elements and parts support (Multiple Vendor Blanket Purchase Agreements (BPAs)). |
Unrestricted |
Mike Monroney Aeronautical Center |
Chris Warden ,FAA Logistics Center 405-954-1394 |
$300,000 |
$400,000 |
1st Qtr 2012 |
1st Qtr 2012 |
| 4446 |
Veracode Software licenses |
Service-Disabled Veteran-Owned Small Business (SDVOSB) Competitive Set-Aside |
National Headquarters |
John Benson ,Office of Information Systems Security 202-267-8284 |
$3,000,000 |
$5,000,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4447 |
Information System (IS) Security Crtification and Accrediation Package (SCAP) Support. |
Service-Disabled Veteran-Owned Small Business (SDVOSB) Competitive Set-Aside |
National Headquarters |
John Benson ,John Benson 202-267-8284 |
$150,000 |
$150,000 |
2nd Qtr 2012 |
2nd Qtr 2012 |
| 4448 |
Website Development (Phase 3). |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Non-Competitive |
Mike Monroney Aeronautical Center |
Cheri Milburn ,AeroNav Products 405-954-8975 |
$50,000 |
$100,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4449 |
IFP-Points |
Unrestricted |
Mike Monroney Aeronautical Center |
Cheri Milburn ,AeroNav Products 405-954-8975 |
$500,000 |
$1,000,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4450 |
Enroute Chart Automation (Phase 3) |
Single-Source |
Mike Monroney Aeronautical Center |
Cheri Milburn ,AeroNav Products 405-954-8975 |
$1,000,000 |
$2,000,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4451 |
Airport Mapping Development. |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Cheri Milburn ,AeroNav Products 405-954-8975 |
$400,000 |
$500,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4452 |
National Airway Systems Engineering Support Services. |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Jackie Seaman ,National Airway Systems Engineering 405-954-7881 |
$300,000,000 |
$355,000,000 |
1st Qtr 2012 |
3rd Qtr 2012 |
| 4453 |
FAROS/Flasing PAPI (Qualified Vendor List Contract). |
Unrestricted |
Mike Monroney Aeronautical Center |
Donnie Hatfield ,National Airway Systems Engineering 405-954-9534 |
$1,500,000 |
$2,000,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4454 |
MALSR Solid State Switcher |
Unrestricted |
Mike Monroney Aeronautical Center |
Donnie Hatfield ,National Airway Systems Engineering 405-954-9534 |
$1,000,000 |
$1,300,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4455 |
MALSR SSS Mod Kit (Qualified Vendor List Contract). |
Unrestricted |
Mike Monroney Aeronautical Center |
Donnie Hatfield ,National Airway Systems Engineering 405-954-9534 |
$350,000 |
$400,000 |
3rd Qtr 2012 |
4th Qtr 2012 |
| 4456 |
Universal Interlock Unit (UIC), QVL Contract. |
Unrestricted |
Mike Monroney Aeronautical Center |
Candace Dodd ,National Airway Systems Engineering 405-954-4694 |
$250,000 |
$300,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4457 |
PAPI Electronic Tilt Switch, QVL Contract. |
Unrestricted |
Mike Monroney Aeronautical Center |
Donnie Hatfield ,National Airway Systems Engineering 405-954-9534 |
$350,000 |
$385,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4458 |
Deploy WinCMS Mod Kit for ATCBI-6, QVL Contract. |
Unrestricted |
Mike Monroney Aeronautical Center |
Tania Ferreira ,National Airway Systems Engineering 405-954-9159 |
$100,000 |
$130,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4459 |
24 Hour Data Recorder Mod Kit for ASR-11, QVL Contract. |
Unrestricted |
Mike Monroney Aeronautical Center |
Tania Ferreira ,National Airway Systems Engineering 405-954-9159 |
$200,000 |
$300,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4460 |
Trifecta Mod for ASR-11 (Qualified Vendor List Contract). |
Unrestricted |
Mike Monroney Aeronautical Center |
Tania Ferreira ,National Airway Systems Engineering 405-954-9159 |
$400,000 |
$500,000 |
3rd Qtr 2012 |
3rd Qtr 2012 |
| 4461 |
MMAC Administrative Support Services. |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Competitive Set-Aside |
Mike Monroney Aeronautical Center |
Sherri O'Dell ,Civil Aviation Registry 405-954-7745 |
$30,000,000 |
$35,000,000 |
2nd Qtr 2012 |
4th Qtr 2012 |
| 4462 |
Educational presentation termed: "Transforming Stress-Building Resilience Workshop (part of HeartMath Resilience and Stress Workshop) |
Single-Source |
National Headquarters |
Meredith Tracey ,Office of Engineering & Safety 202-385-7120 |
$10,500 |
$12,000 |
2nd Qtr 2012 |
3rd Qtr 2012 |
| 4463 |
VitalSmarts Influencer Training |
Single-Source |
National Headquarters |
Meredith Tracey ,Office of Systems Engineering & Safety 202-385-7120 |
$15,775 |
$20,000 |
1st Qtr 2012 |
2nd Qtr 2012 |
| 4464 |
Organizational Effectiveness / Development Support / Facilitation Services |
Undecided |
National Headquarters |
Hector Rea ,NextGen Performance and Outreach 202-385-7162 |
$240,000 |
$350,000 |
4th Qtr 2012 |
4th Qtr 2012 |
| 4465 |
Support NextGen Implementation Performance & Reporting Office |
Socially & Economically Disadvantaged Business (SEDB) 8(a) Non-Competitive |
National Headquarters |
Pamela Gomez ,NextGen Performance and Outreach 202-385-7170 |
$50,000 |
$3,900,000 |
1st Qtr 2012 |
1st Qtr 2012 |